For cnc machining centre does all the work, as long as the price is reasonable, cnc machining centre does all the work has a leading advantage in the industrial market, but they often overlook the most important cnc machining centre does all the work Operation and maintenance. At the same time, the matters needing attention in cnc machining centre does all the work should also be understood.
1. Before starting the machine, confirm the model, size and machining allowance of the processed blank according to the program sheet, and perform sand removal and polishing treatment on the blank.
2. After getting on the machine, confirm the placement of the workpiece and the processing sequence to complete the comparison.
3. For centering, if you need to "center the bar" for centering, the speed is 501R/M. For centering with a tool, the speed depends on the tool. In this process, you should also pay attention to the number of points at the same height to ensure The accuracy of scoring can be checked by "G0 G54 X0 Y0" after scoring.
4. Before formal processing, let the programmer finally confirm whether the placement position of the workpiece and the number of fetches are correct.
About the maintenance of cnc machining centre does all the work
1. Clean and maintain cnc machining centre does all the work half an hour before work every day. If you use an air gun or oil gun to clean the chips, there must be a knife on the spindle.
It is forbidden to blow the spindle taper hole with an air gun or oil gun to avoid small particles such as chips from being blown into the spindle hole and affect the cleanliness of the spindle.
2. Check whether the lubrication system is working normally and whether the lubricating oil is sufficient, and start the machine in the normal order.
3. Start the spindle before the cnc machining centre does all the work (rotation speed is 501R/M) to preheat the spindle