Vertical cnc milling is a kind of machine with more complicated logic, which refers to the machining center with the spindle and worktable set in the vertical state. It is developed from the basic CNC milling machine, and also integrates the features and functions of the CNC milling machine. It is mainly suitable for processing complex parts such as plates, disks, molds and small shells, and can complete processes such as milling, boring, drilling, tapping and cutting threads. So what are the operating precautions for vertical machining centers?
Points for Attention in the Operation of Vertical Machining Center:
1. Before operation, wear all labor protection supplies, perform smooth maintenance as required, and check the oil level of each smooth oil.
2. The machining program should be checked and correct before it can work, and the matching of the cutter should be recognized when using the high-speed function.
3. When there are too many iron chips in the chip flute, clean it manually before opening the chip conveyor.
4. When clamping the work piece, it should be handled with care to avoid bumping or hitting the work surface; when the work piece is heavy, the load capacity of the machine tool work table should also be verified, and overloading work is forbidden.
5. During the processing of the vertical machining center, pay attention to whether the movement and processing conditions of the machine tool are normal and abnormal phenomena are encountered. In the event of noise or alarm, the machine should be shut down immediately for inspection and disposal, and processing can be continued after the fault is removed.
6. After the machine tool is started, check whether the movement of the spindle, the work table in each direction and the pressure indicators are normal, whether there are abnormal noises, etc.
7. The operator of a new machine tool should understand the machine's functions, operating methods and precautions, and then operate on the machine under the guidance of the relevant personnel.
8. After the workpiece is processed, clean the workbench, scrub and smooth the machine tool, clean the surrounding area, and keep the place tidy.
9. The control system must be closed before the main power supply of the machine tool; the emergency stop switch should not be used in non-emergency situations.
10. Before leaving get off work every day, you should fill in the work records of the machine tool and make a good handover.
The precautions for the operation of the vertical machining center are shared here. The vertical machining center is a vertical machining center machine controlled by a CNC (computer numerical control device) and performing cutting processing, which can perform drilling, tapping and milling; It can solve the processing problems of complex, precise, small batch, and multi-variety parts. Drilling, tapping and milling can be completed in one clamping on the vertical machining center.